Skip to ContentCity of Des Plaines Logo
City of Des Plaines Logo

City ServicesLiving In Des PlainesGovernmentEconomic DevelopmentOnline Reference Desk

Hot Items
Search Website
 
 Advanced Search
Have A Question?  Ask Des Plaines!

City of Des Plaines Logo

 

Quick Reference Links
Flood Protection
Great Eats and More
Bids and Proposals
Building Permit Information
Chamber of Commerce
Minutes and Agendas
Directory
E-Pay
Email List
Employment
Forms and Applications
Freedom of Information Request (FOIA)
Frequently Asked Questions
Site Map
Special Events
Zoning Information
Zoning Ordinances

City ServicesEngineering
There are forms or permits related to this department available in the Online Reference Desk section of our website.  Click here.Overview  |  Department Head Biography  |  Capital Improvement Program
Developer Information    |  Flood Protection  |  Combined Sewer Overflow
Frequently Asked Questions  |  Links
Engineering     Capital Improvement Program
Overview  |  Levee 50 Flood Control Project  |   This document is available to view in PDF format. Riverwalk Project (Proposed Improvements)
This document is available to view in PDF format. Railroad Grade Separation (Validation Study)  |  Sidewalk, Curb and Driveway Guidelines

Rand Park Flood Control and Multi-Use Trail Project (Levee 50)

This document is available to view in PDF format. Rand Park Flood Map
This document is available to view in PDF format. Levee 50 Phase III Groundbreaking (6.2 MB)

Project Overview

Flooding from the Des Plaines River causes $1,315,500 of total average annual flood damages to 181 structures in the cities of Des Plaines and Park Ridge and in unincorporated Maine Township. This average annual damage figure includes $884,300 average annual structural damages, $298,500 of average annual traffic damages and $132,700 of average annual indirect flood damages. The Rand Park Flood Control and Multi-Use Trail Project eliminates these flood damages and provides additional recreational benefits along the Des Plaines River.

The Rand Park Flood Control and Multi-Use Trail Project is the first of six flood control projects included in the U.S. Army Corps of Engineers’ Des Plaines River Project. As a state sponsor for the Corps’ federal project, the Illinois Department of Natural Resources/Office of Water resources (IDNR/OWR) agreed to design and construct the Rand Park Project as part of the Department’s financial obligation to the federal project. The cities of Des Plaines and Park Ridge serve as local sponsors for the project and as such, will ultimately own, operate and maintain the flood control and multi-use trail system constructed.

Project Phases

The project will be designed and constructed in three phases. The attached exhibit illustrates the location of the project and the project components of all three phases. The first phase of the project has already been constructed. It included extending an existing 48-inch culvert under the Union Pacific Railroad to facilitate a clay blanket on the riverward face of the embankment, constructing an outlet headwall and installing a 48-inch Tide Flex gate at the end of the culvert extension.

Phase 2 of the project included: construction of a gated closure structure; pump station and appurtenant works on Prairie-Farmer’s Creek immediately upstream of the Union Pacific Railroad; a clay blanket along the riverward face of the embankment; and environmental mitigation. Construction on Phase 2 began in July of 2003 with substantial completion in June of 2005.

Phase 3 of the project includes: floodwalls; levees; a multi-use trail and appurtenant works; a Miner Street underpass; closure structures at Rand Road and Ballard Road; interior storage basins; and a Golf Road Interceptor Sewer gate at Big Bend Lake.

The multi-use trail and Miner Street underpass components of Phase 3 are part of a federally funded Grand Illinois Trail project. The 12-foot wide trail (10-foot wide trail and two, 1-foot wide shoulders) is to be built on the River side of the floodwall and will close a crucial gap in the roughly 50-mile Des Plaines River Trail and the greater Grand Illinois Trail. The underpass will consist of a 12-foot wide by 10-foot high box culvert running underneath Miner Street to serve as a trail tunnel and to provide additional flow opening during times of high water.

Construction on Phase 3 began in July of 2006 and is expected to be complete by June of 2008. When fully completed, the project will provide flood protection from 100-year frequency flood stages (minimum 1.7 feet freeboard) on the Des Plaines River.

 

 

 

Living In Des Plaines  |  Your Local Government  |  Your City Services
Economic Development  |  Online City Reference Desk
  Search  |  Site Map  |  Home

 

Award Winner - MuniNet Guide and Review

Municipal Web Services' Accessibility Logo.  Click here to go to the Municipal Web Services' website to read more about Accessibility.

Send feedback to the City by clicking here.
Click here to report a website technical issue.

This site is best viewed in Internet Explorer 7.0 or higher or Firefox 2.0 or higher.

City of Des Plaines
1420 Miner St.
Des Plaines, IL  60016
847-391-5300

Adobe Acrobat Reader Logo
This site has documents available
 in PDF format.  If your browser does
 not have the Acrobat Reader
plug-in that is required to view
these documents, click here to
 download a free copy of this software.

Site Design/Development by
Bringing the World to Your Corner of the World

Site Use Policy

All information © 2008 Des Plaines, Illinois 

ICCS Licensed Web Site Labeled with ICRA This site is rated with SafeSurf.

Events Calendar
8/21/08 Consumer Protection Commission
8/25/08 Plan Commission - MEETING CANCELLED
8/26/08 Zoning Board of Appeals
8/27/08 Architectural Commission
News Headlines
8/15/08 Busse Highway Resurfacing
8/15/08 Levee 50 Construction/Traffic Change on Miner Street
8/06/08 River Road Resurfacing
8/1/08 Des Plaines - One of the First in Illinois Prepared to Save Newborns
7/10/08 Volunteers Sought At Des Plaines Food Pantry

More...